Aylesbury Theatre
This new theatre project (by Arts Team/ RHWL Architects) completed in October 2010 and was the catalyst for a wider master-plan scheme for Aylesbury town centre. During his employment at Arts Team, Red Squirrel Architects director – Miles Griffies – was instrumental in his role as project architect, contract administrator, and site architect. The design of the theatre provides an adaptable main auditorium space with a 1200 seated capacity, and 1800 standing capacity. A second multi-purpose space is capable of seating 250 people. A curved glazed facade with rhythmic vertical Larch fins wraps around the main auditorium box to form the theatre foyers. Red Squirrel Architects were later appointed to carry out the detailed design development of the theatre external works package.